Conclusions and results of the VGTogether project (infrastructure progress review)

In order to reduce the workload of management and production of test items, the VGTogether project has set up a central, generic infrastructure for progress assessment. With this infrastructure in combination with the item management system IMS, the possibilities for digital purchase of the progress test have been greatly improved.

 

Student achter laptop in bibliotheek vanaf verhoging met koptelefoon

This content is only available in Dutch

Read this article in Dutch